Portable Hygiene Solutions

Durable modular units and lightweight EPS toilets for insulated, easy-to-move sanitation.

Home Prefabricated Building WashRoom

Portable Washroom Solutions: Choose Your Perfect Fit

ZN-House delivers premium yet affordable portable sanitation for your construction sites, events, and remote locations. Experience uncompromised hygiene and durability with our two specialized solutions:
Lightweight & Efficient Constructed with Expanded Polystyrene (EPS) panels, these units offer exceptional thermal insulation and corrosion resistance. Ultra-lightweight for easy relocation yet structurally robust. Ideal for:
  • Construction sites (quick deployment/removal)
  • Parks & recreational areas
  • Temporary venues (festivals, outdoor markets)
Learn More
Heavy-Duty & Permanent-Feel Built from repurposed shipping containers with reinforced steel frames. Designed for long-term use and high-traffic demands. Features vandal-proof fixtures and optional wheelchair access. Perfect for:
  • Multi-year construction projects
  • Mining/industrial camps
  • Semi-permanent installations (stadiums, tourist sites)
Learn More

Revolutionizing Site Sanitation:
How Container Washrooms Solve Industry Pain Points

Pain Point Traditional Toilets ZN-House Container Solution User Benefit
Slow Deployment 30-45 day construction cycles delay projects ✅ 72h turnkey delivery®
• No foundation needed
• 20+unit cluster deployment
▶ Launch projects 80% faster
Relocation Waste Demolition required (0% reuse) ✅ 100% relocatable®
• Crane-lift modular mobility®
• Zero reassembly cost
▶ 5+reuse cycles = 42% TCO savings
Water Leakage 37% failure rate from field errors ✅ Zero-leak guarantee®
• 3-step factory QC:
1) Seam sealing →
2) Pressure testing →
3) Rain simulation
▶ Eliminate $15k+/unit repair costs
Customization Limits Costly post-install modifications ✅ Pre-engineered flexibility®
• Explosion-proof specs®
• ADA ramps
• Chemical-resistant piping
▶ Perfect fit for mines/industrial sites
Budget Hidden change orders (+35% avg.) ✅ Fixed factory pricing®
• All-inclusive packages®
• 5-year maintenance included
▶ Accurate forecasting + 30% CAPEX reduction
Key Technical Differentiators:
1. Speed Crisis Solved: 30 Days → 72 Hours
Traditional Nightmare
  • 45-day average build time delays critical projects
  • Foundation work extends site disruption
  • Sequential installation bottlenecks
Our Engineered Solution
    • Plug-and-Play Deployment
Factory-commissioned units ship ready-to-use Zero foundation: Install on compacted soil in <4 hours
    • Mass Scalability
*Case: 10,000-worker mining camp operational in 5 days*
commercial modular building manufacturers
2.Eradicating 37% Leakage Rates
Traditional Defects
  • Field welding/caulking fails under stress
  • Pipe misalignments cause chronic leaks
  • ±15mm tolerance gaps
High-Grade Containment
    • Triple-Sealed Defense
Robotic seam sealing (≤0.2mm precision)
24hr 2x-PSI pressure torture test
Monsoon simulation chamber validation
    • Automotive QC Protocol
| Production Stage | Quality Check |
| Welding | X-ray penetration scan |
| Plumbing | 0.6MPa air pressure test |
| Assembly | 72hr continuous flow trial |
→ *Result: 83% fewer defect claims vs. site-built units*
modular office manufacturers
Technical Breakthroughs
Space Revolution
  • 6 fully functional units (3 toilets + 3 sinks) in 20ft container
  • 60% smaller footprint vs. conventional builds
  • Stackable for festivals/disaster relief
Zero-Compromise Quality
  • Corten steel frames (2.0mm thickness)
  • Vibration-dampened pipe joints
  • GDPR-compliant waste tanks

Precision Sanitation Planning: Match Units To Your Project

Selecting adequate units prevents queues and ensures compliance. ZN House recommends these proven methods:
EPS Portable Toilets
Assembly Container Toilets
Gender Factor:
  • Male-dominated: +0%
  • Balanced: +15%
  • Female-dominated: +25%
Example (120 attendees, 60% women):
  • Base: 120 ÷ 30 = 4 units
  • Adjustment: 4 × 25% = 1 unit
  • Total: 5 EPS units

Best for: Festivals • Parks • Short-term construction

custom container manufacturers
custom container manufacturers
custom container manufacturers
custom container manufacturers
custom container manufacturers

 

Units = (Peak Workers ÷ 25) × Duration Factor + Safety Buffer

Project Duration

Factor

Buffer

6-12 months

1.0

+1

1-3 years

1.2

+2

3+ years

1.5

+3

Example (80 workers, 2-year mine camp):

  • Base: 80 ÷ 25 = 3.2 → 4 units
  •  Duration: 4 × 1.2 = 4.8 → 5 units
  • Buffer: +2 units
  • Total: 7 Container units

Ideal for: Mining • Oil rigs • Permanent installations

Smart Configuration Advisor

modular building companies
modular building companies

Scenario

EPS Recommendation

Container Recommendation

150-person wedding

6 units (1 luxury VIP)

Not recommended

50-worker road crew

3 units

2 units (if >6 months)

200-attendee festival

8-unit cluster

N/A

300-miner camp

Temporary supplement

14-unit complex

Critical Adjustments:

  • Add 25% for:
  • Alcohol service (EPS)
  • Temperatures >35°C (both)
  • 24/7 shifts (Container)
modular building companies
modular building companies
modular building companies

Application Scenario Solutions

Modular Toilet
Container Washroom
1. Modular Toilet: Industrial & Construction Excellence
  • Construction Zone Solution: Dynamic Workforce Optimization
  • Challenge: Fluctuating worker density (50-200/day), extreme dust/temperature, high maintenance costs
• Smart Deployment Formula:

1 Unit = 3 Toilets + 2 Sinks

  • Standard: 1 unit per 50 workers → Peak: 1:35 density
• Industrial Zone Resilience Package:
  • Spiral ground anchors (±15° slope adaptation)
  • 75mm anti-clog drainage (5‰ gradient)
  • Nano-catalytic wall coating (NH₃ reduction)

*Case: NZ construction site reduced COVID delays by 37% with 5-unit clusters*

modular office companies
Zone Type Unit Function Density Requirement
Production Workshop Basic toilet + quick-clean area 1 unit per 100 people
Administrative Office Area Accessible facilities + nursing room 1 unit per 80 people
Hazardous Chemicals Operation Area Explosion-proof ventilation + emergency shower Independent isolation unit
2.Container Washroom: Municpal & Public Serviceinnovation

Municipal public services Network: Elastic Urban CoverageChallenge:Aginginfrastructure,event surges (50,000+users), disaster response.

• Layout schematic description.Deployment Modes:
prefabricated modular building companies
Type Use Case
Fixed Parks/Bus Hubs (landscape integration)
Mobile Festivals (48 h setup)
Disaster Flood Zones (solar-powered)

Industry-Tailored Packages

Modular Toilet - Industrial Zone Pro Pack

✓ Explosion-proof ventilation

✓ 316L stainless pipes (acid resistance)

✓ RFID maintenance tracking

 

Container Washroom - 123 Elite Pack

✓ Rainwater recycling (2,000L/day)

✓ NFC emergency alerts

✓ ADA-compliant ramps

 

Sustainable Technology Integration

Off-Grid Operation Capability:

  • Rooftop solar panels (2.5kWh daily power generation)
  • Rainwater harvesting → MBR membrane filtration → Toilet flushing water

 

Citizen Interaction Upgrades:

  • App displays available stalls + one-tap SOS alert
  • Priority access for seniors (NFC-enabled unlocking)

Tailored-To-Project Manufacturing Journey

custom container manufacturers
Specification Audit
Factory Toilets Production Protocol
Global Deployment Engineering
Step 1:Specification Audit
  • Define critical parameters:
  • User capacity (50-500+ persons)
  • Utility connections (grid/solar/rainwater)
  • Material selection: 304 stainless steel vs. marine-grade composites
Step 2:Factory Toilets Production Protocol
  • Factory Toilets Production Protocol:
  • 1.Welding → X-ray penetration scans
  • 2.Plumbing → 48hr 0.6MPa pressure tests
  • 3.Ventilation → CFD-optimized airflow validation
Step 3:Global Deployment Engineering
  • Modular Toilet shipping efficiency:
  • 12 EPS units or
  • 4 Container units per 40ft HQ container
  • On-site commissioning: <8hr installation with ZN House-certified crews across 17 countries
Why Partners Choose Our Process
Phase Industry Standard ZN House Advantage
Design Finalization 2–4 weeks 72 h with 3D mockups
Production 8–12 weeks 4–6 weeks (ISO-paced)
Leak Certification Singletest Triple validation
Process Advantage Highlights
For Mining/Industrial Clients
For Municipalities
Spec Signoff
Day 1
Raw Material Cut
Day 2
Module Assembly
Day 4
Triple QC Tests
Day 5
Global Shipping

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.

  • Name

  • Email (We will reply you via email in 24 hours)

  • Phone/WhatsApp/WeChat (Very important)

  • Enter product details such as size, color, materials etc. and other specific requirements to receive an accurate quote.


If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.